Challenge
Swissbility needed a fast, cost-effective and sustainable parking solution for approximately 250 cars on an existing grassed area. The car park was required for five years and then needed to be removable without leaving any permanent traces.
Solution
4,480 m² of Terra-Grid E® 35 was installed with minimal ground preparation, and the modular system enabled rapid installation.
Result
Construction costs were reduced by up to 60% compared with asphalt and concrete. After the five-year period of use, the area can be restored to its original condition.
- Up to 60% lower construction costs
- Rapid installation with minimal ground preparation
- Removable without leaving permanent traces